4、如果在使用过程中,因操作不当导致加热板进水,应首先联系厂家进行维修。如果需要进行应急抢修,可将加热板上盖板打开,先将水倒出,然后将电控箱设置为手动操作,加温到100℃,保持恒温半个小时,将线路烘干,在在手动状态下进行皮带胶接。同时应及时联系生产厂家,进行线路的整体更换。
1, vulcanizing machine storage environment should be kept in dry, well ventilated environment in use, so as not to rust.
3. If the working environment is wet and water-rich, when the vulcanizer is dismantled and handled, it should be padded with articles on the ground, and do not let the vulcanizer contact with water directly.
4. If improper operation results in water inflow of heating plate in the process of use, it is necessary to contact the manufacturer for maintenance first. If emergency repair is needed, the heating plate cover can be opened, the water is poured out first, then the electric control box is set to manual operation, heating to 100 C, keeping constant temperature for half an hour, drying the circuit, and bonding the belt in the manual state. At the same time, manufacturers should be contacted in time for overall replacement of lines.
6. After each use, the water in the water pressure plate should be cleaned, especially in winter. If the water can not be cleaned, it will often lead to premature ageing of the rubber and reduce the service life of the water pressure plate.
7. The correct way to release water is to carry out the vulcanizing machine before it is removed. If the water is released after the machine is dismantled, it may cause the water in the water pressure plate to not be discharged completely.